Construction mega projects: coordinating many sites and many firms in one system

A mega project is not just a big job: it is several sites, several companies and hundreds of documents that have to stay aligned. Here is how SubmitX structures a mega project, how partner firms work in it without an account, and what the software does not do.

The real challenge of a mega project

On a mega project, information moves between the general contractor, architects, engineers, subcontractors and suppliers. Each has their own tool, their own emails and their own version of the drawings. The risk is not technical: it is a crew building from a superseded sheet, or a supplier delivering on the wrong date without anyone knowing.

💡 The goal: one version of the drawings, the schedule and the commitments, shared with every firm, including those that do not use SubmitX.

The situations that derail a large project look the same from one site to the next:

Each has a specific answer in SubmitX: a drawing log with read receipts, date confirmations by link, the supplier portal, "who has the ball" counters per person, and a cost to complete updated by purchase orders, receipts and hours.

Structuring the project: groups, programs, locations and packages

ElementWhat it does
Mega projectGroups 2 to 30 sites
Program and sub-projectsA program's sub-projects are rolled up
LocationsBuilding, floor, zone, linked to tasks and drawings
Work packagesBudget, commitments, spent and remaining per package

Cost to complete, earned value and planned versus actual progress are tracked per package, and every amount can be broken down to explain where it comes from.

Partner firms, without an account

Architects, engineers, subcontractors and suppliers get a personal, expiring, revocable link to a partner portal, for up to 10 people per invited firm. There they find:

Companies that already use SubmitX can also collaborate directly: a collaborators address book, invitations between companies and a "Shared projects" view.

On the schedule side, a subcontractor linked to a phase gets a link to confirm dates, and the confirmations centre shows live who has confirmed and who has not answered yet. When the schedule moves, the impact preview shows which firms are affected before you send anything.

Supplier portal, drawings and submittals

The supplier portal

One link per supplier for all its purchase orders. The supplier acknowledges, gives a delivery date, proposes a backorder or a price or quantity change. It never edits an amount itself: you accept the change.

The drawing log

Drawings are sorted by discipline and set, with the current revision and its status; a superseded sheet is stamped "do not build". Publishing a revision notifies the people involved, with read receipts and reminders. Submissions from architects and engineers are accepted or refused as revisions.

Submittals and RFIs

Shop drawings, samples and product data follow their review path; RFIs can start from a photo and be pinned on drawings.

3-week lookahead and unified messages

The Gantt covers every site, with critical path and baselines. The 3-week lookahead shows what is ready or blocked, constraints, weekly commitments and percent kept, with an impact preview and sending to the firms involved. Subcontractors confirm their dates by link.

The unified messages inbox brings together your team, clients, other companies and emails in one place.

Project money, package by package

Across many sites, a cost problem is often found too late. SubmitX tracks budget, commitments, spent and remaining per package, earned value (EAC, ETC, schedule index), work in progress and a risk register.

Industries and trades this fits

The Ultra plan is designed for this reality; prices are on request.

What SubmitX does not do

The best test is a real project in a demo.

Frequently asked questions

How many sites can a mega project group?

A mega project groups 2 to 30 sites. Programs also roll up their sub-projects.

Do architects and engineers need to buy SubmitX?

No. They get a personal, expiring, revocable link to a partner portal, with no account to create, for up to 10 people per invited firm.

Can a supplier change a price in the portal?

No. It can propose a backorder or a price or quantity change, but it never edits an amount itself.

How do you avoid building from a superseded drawing?

The drawing log keeps the current revision and stamps superseded sheets "do not build". Each revision published notifies the people involved, with read receipts.

Can we import a Primavera P6 schedule?

Yes. SubmitX imports and exports Primavera P6 (.xer), Microsoft Project (.xml) and Excel files.

How many people from one firm can use the partner portal?

Up to 10 people per invited firm, each with their own personal link.