The problem: the wrong version in the wrong hands
The architect emails revision C. The project manager saves it on their laptop. On site, the printed sheet is still revision B, and the crew frames the openings in the wrong place. It happens all the time, and it rarely ends without demolition.
Questions to the design team (RFIs) get lost in email threads. Shop drawings wait for an approval nobody chases. And at night the foreman still has to write a report about a day spent running.
SubmitX plans and documents aim for three things: everyone opens the current version, every question has an owner and a due date, and the daily report reflects what actually happened.
The drawing log and revisions
Drawings are sorted by discipline and set, with the current revision and its status. A superseded sheet is stamped “do not build” so it is never mistaken for the right one.
- Sheet index across many pages, to find a drawing in an 80-sheet set.
- Publish and notify: a new revision is published and the team is notified, with read receipts and a remind button.
- Design team submissions: a document sent by the architect or engineer is accepted or refused as a revision.
- Pins on drawings: RFIs, issues and photos placed exactly where they belong.
- Transmittal log, specifications sorted by division and version history.
- Offline: drawings, PDFs and photos stay available on the phone with no signal.
💡 Read receipts settle a question that comes up in every site meeting: “Did you have the right version?” The answer is in the log, with a date.
RFIs and submittals: who has the ball
Create the RFI
From the office, or from a photo taken on site. AI can draft it from the photo, and you review before it goes out.
Send it to the right firm
Architects, engineers and subcontractors answer through a partner portal, with a personal link that expires and can be revoked, no SubmitX account required.
Track the due date
Overdue, this week and later counters are grouped by person. You see who has the ball, with reminders.
Close it with the answer
The answer stays attached to the RFI and to its pin on the drawing, visible to the team.
Shop drawings, samples and product data follow the same path: submitted, under review, approved or rejected, with a record of each step.
Site log and daily reports
The daily report is pre-filled from the day's real data: who clocked in, on which phase, the photos taken, the weather. The foreman completes it instead of writing it from scratch. The log is browsable by date.
- Photos and videos in folders, with a map and a before and after view.
- Punch lists and inspections, also on the phone offline.
- Meeting recorder: an audio recording becomes a transcript, then minutes with decisions, actions and questions turned into tasks after your review. Open actions carry over to the next meeting.
- Site AI: photos, videos and dictation become a site report, a progress report or a safety report that you review before validating.
Industries and trades that benefit most
Everyone can use these tools, but they become central once outside design firms and multiple revisions are involved.
| Trade or company type | Why it matters |
|---|---|
| General contractor | Drawing log, RFIs, submittals, change orders, design team coordination |
| Commercial and institutional | Large drawing sets, transmittals and specifications by division |
| Electrician | Technical questions on drawings, pins right where the issue is |
| Fire protection | Inspections and shop drawings to get approved |
| Doors and windows | Product data and installation photos |
| Remodeling | Before and after photos, a log to show the client |
The full list is on the industries page.
Honest limits
- Full project management is on the Pro plan. See pricing.
- AI proposes, you decide. An RFI drafted from a photo or a pre-filled log must be reviewed: AI can be wrong.
- A log is only reliable if revisions go through it. If a drawing only travels by email, SubmitX cannot mark the old one as superseded.
- A partner portal holds up to 10 people per invited firm.
How it ties into the rest of SubmitX
A late RFI shows up as a constraint in the 3-week lookahead. A request outside the contract can be compared to the accepted bid and turned into a change order. Photos from the log feed the progress update sent to the client portal.
Next, read about the Gantt and 3-week lookahead or browse the features page.
Setting it up on a job already underway
You do not need to wait for a new project. On a job already in progress, setup takes about half a day in the office, usually in this order.
- Upload the current drawing set, sorted by discipline, with the revision of each sheet.
- Invite the design team and key subcontractors to the partner portal, each with a personal link.
- Bring in open RFIs: one line per question, with an owner and a due date.
- List the submittals you expect, even empty, to see what is missing.
- Ask the foreman to validate the first pre-filled daily report at the end of the day.
After two weeks, the log becomes the reference. “Which version is current?” gets answered by opening the drawing, not by calling the office.
💡 Start with open RFIs. They are what blocks crews today, and they show the value of tracking first.
Frequently asked questions
How do I stop crews from building off an old drawing?
Every superseded sheet is stamped “do not build”, the current revision is shown, and publishing a revision notifies the team with read receipts.
Do architects need an account?
No. They get a personal link to a partner portal that expires and can be revoked.
Can an RFI be created from the field?
Yes, from a photo taken on the phone. AI can draft the text, which you review before sending.
Does the daily report fill itself in?
It is pre-filled with the day's real data (hours, photos, weather). The foreman completes and validates it.
Are drawings available without a signal?
Yes. Drawings, PDFs and photos can be kept offline on the phone.