Drawing log, RFIs, submittals and daily reports: project documents in one place

Building from an outdated drawing is expensive, and an unanswered question idles a crew. SubmitX keeps the drawing log by revision, tracks RFIs and submittals until they are answered, and pre-fills the daily report from what really happened. Here is how.

The problem: the wrong version in the wrong hands

The architect emails revision C. The project manager saves it on their laptop. On site, the printed sheet is still revision B, and the crew frames the openings in the wrong place. It happens all the time, and it rarely ends without demolition.

Questions to the design team (RFIs) get lost in email threads. Shop drawings wait for an approval nobody chases. And at night the foreman still has to write a report about a day spent running.

SubmitX plans and documents aim for three things: everyone opens the current version, every question has an owner and a due date, and the daily report reflects what actually happened.

The drawing log and revisions

Drawings are sorted by discipline and set, with the current revision and its status. A superseded sheet is stamped “do not build” so it is never mistaken for the right one.

💡 Read receipts settle a question that comes up in every site meeting: “Did you have the right version?” The answer is in the log, with a date.

RFIs and submittals: who has the ball

1

Create the RFI

From the office, or from a photo taken on site. AI can draft it from the photo, and you review before it goes out.

2

Send it to the right firm

Architects, engineers and subcontractors answer through a partner portal, with a personal link that expires and can be revoked, no SubmitX account required.

3

Track the due date

Overdue, this week and later counters are grouped by person. You see who has the ball, with reminders.

4

Close it with the answer

The answer stays attached to the RFI and to its pin on the drawing, visible to the team.

Shop drawings, samples and product data follow the same path: submitted, under review, approved or rejected, with a record of each step.

Site log and daily reports

The daily report is pre-filled from the day's real data: who clocked in, on which phase, the photos taken, the weather. The foreman completes it instead of writing it from scratch. The log is browsable by date.

Industries and trades that benefit most

Everyone can use these tools, but they become central once outside design firms and multiple revisions are involved.

Trade or company typeWhy it matters
General contractorDrawing log, RFIs, submittals, change orders, design team coordination
Commercial and institutionalLarge drawing sets, transmittals and specifications by division
ElectricianTechnical questions on drawings, pins right where the issue is
Fire protectionInspections and shop drawings to get approved
Doors and windowsProduct data and installation photos
RemodelingBefore and after photos, a log to show the client

The full list is on the industries page.

Honest limits

How it ties into the rest of SubmitX

A late RFI shows up as a constraint in the 3-week lookahead. A request outside the contract can be compared to the accepted bid and turned into a change order. Photos from the log feed the progress update sent to the client portal.

Next, read about the Gantt and 3-week lookahead or browse the features page.

Setting it up on a job already underway

You do not need to wait for a new project. On a job already in progress, setup takes about half a day in the office, usually in this order.

  1. Upload the current drawing set, sorted by discipline, with the revision of each sheet.
  2. Invite the design team and key subcontractors to the partner portal, each with a personal link.
  3. Bring in open RFIs: one line per question, with an owner and a due date.
  4. List the submittals you expect, even empty, to see what is missing.
  5. Ask the foreman to validate the first pre-filled daily report at the end of the day.

After two weeks, the log becomes the reference. “Which version is current?” gets answered by opening the drawing, not by calling the office.

💡 Start with open RFIs. They are what blocks crews today, and they show the value of tracking first.

Frequently asked questions

How do I stop crews from building off an old drawing?

Every superseded sheet is stamped “do not build”, the current revision is shown, and publishing a revision notifies the team with read receipts.

Do architects need an account?

No. They get a personal link to a partner portal that expires and can be revoked.

Can an RFI be created from the field?

Yes, from a photo taken on the phone. AI can draft the text, which you review before sending.

Does the daily report fill itself in?

It is pre-filled with the day's real data (hours, photos, weather). The foreman completes and validates it.

Are drawings available without a signal?

Yes. Drawings, PDFs and photos can be kept offline on the phone.