The problem: a schedule nobody trusts
On most jobs the schedule exists in three versions: the one in the contract, the one in the project manager's file and the one in the foreman's head. When forming runs two days late, nobody knows for sure which activities slip behind it or who needs a call.
You see it on site. The electrician shows up before the walls are ready, the drywall crew waits, the client calls to ask when they can move in. Every coordination call takes time, and every poorly communicated delay costs a crew day.
- Dates are retyped by hand after every change.
- Subcontractors hear about a delay by text, or not at all.
- Nobody sees how a delay moves the finish date until it is too late.
- Next week gets planned on Friday night, from memory.
SubmitX scheduling starts from a simple idea: one timeline, connected to the rest of the project, that every party can see and confirm.
How the Gantt comes together in SubmitX
The signed bid creates the project
At the client's last signature, SubmitX creates the project, one Gantt phase per trade, the budget and the employee tasks. You never start from a blank sheet.
You set durations and links
You place phases, tasks and milestones, then link what depends on what. The critical path shows up: the activities where any delay pushes the finish date.
You save a baseline
A baseline keeps the original plan. Later you compare the current plan to it and see where the job slipped, and by how much.
You plan the next 3 weeks
The 3-week lookahead shows what is ready and what is blocked, with its constraints (materials, drawings, inspections). Each week the crew makes commitments and SubmitX tracks the percent kept.
Subcontractors confirm by link
When a date changes, the firms involved get a personal link. They confirm without creating an account, and the Gantt updates live.
Bring in an existing schedule
A schedule can also arrive ready-made. SubmitX imports Excel, Microsoft Project (.xml) and Primavera P6 (.xer) files, with a preview and an undo. It exports to PDF, Excel, MS Project and P6 too, which helps when an owner or construction manager requires a specific format.
One project or all of them
Open the Gantt for a single job or across every active job to spot two projects asking for the same crew in the same week. The calendar also has a Gantt view next to its month, week and day views.
Real situations on site
A few typical moments, the way a contractor lives them:
- The pour gets pushed by rain. You move the concrete phase. Dependent activities follow, and the impact preview shows the new finish date before you confirm.
- The job stops for two weeks. A schedule pause holds the project, then recalculates dates when work resumes, instead of dragging every bar by hand.
- The electrician wants to know when to mobilize. They receive the date by link, confirm it, and you see who confirmed and who did not.
- Monday morning. The site meeting runs from the 3-week lookahead: what is ready, what is blocked and what was promised last week.
💡 Percent of commitments kept is a good read on schedule reliability. If it drops week after week, the cause is often upstream (drawings, materials, inspections), not the crew.
Progress tracking compares planned to actual, and the milestone and crew-schedule views let you brief the client or management without rebuilding a chart.
Industries and trades that benefit most
Every trade has the Gantt. The ones who get the most out of it are those whose work depends on others, or who juggle several crews at once.
| Trade or company type | Why the Gantt matters |
|---|---|
| General contractor | Coordinating every trade, 3-week lookahead, change orders that move dates |
| Concrete and formwork | Pour schedule on the Gantt, sensitive to weather and inspections |
| Carpenter and framer | Gantt by phase, timesheets and crew production per unit |
| Drywall and plaster | Phase tracking and change orders, start depends on mechanical and electrical |
| Excavation | Sequencing at the start of the job, equipment to book |
| Remodeling | Client on site, dates shared in the client portal |
Public and institutional projects also benefit from Microsoft Project and P6 import and export, often required by owners. Trade by trade details are on the industries page.
Honest limits
- The Gantt is part of the Pro plan. Free and Starter include tasks and the calendar, not full project management. See pricing.
- The critical path depends on the links you enter. SubmitX does not guess that one task waits for another: if the dependency is missing, it is not in the calculation.
- A link confirmation assumes the subcontractor answers. SubmitX shows who has not confirmed and lets you remind them, but it does not replace a phone call when it is urgent.
- Durations are still your estimate. The software recalculates dates; it does not know how long your crew takes to lay a floor.
How it ties into the rest of SubmitX
The schedule is not an island. Phases carry employee tasks, which crews find in their mobile agenda. Hours clocked on a phase feed the project cost, and the budget tracks commitments and cost to complete.
- Site weather: the forecast at the project address, with a daily risk for the planned work.
- Client portal: the company can show milestones and, if it chooses, the critical path to the client.
- Calendars: Google, Outlook and iCal so dates show up in the usual agenda.
- Documents: late RFIs and submittals are visible before they block a phase. See the article on the drawing log, RFIs and submittals.
For every module, see the features page or the guide to construction scheduling software.
Frequently asked questions
Do I rebuild the schedule for every project?
No. The signed bid creates one phase per trade. You can also import an Excel, Microsoft Project or Primavera P6 file, with a preview and an undo.
What is a 3-week lookahead?
A view of the next three weeks that separates ready work from blocked work, records constraints and tracks the percent of weekly commitments the crew kept.
Do subcontractors need a SubmitX account?
No. They receive a personal link to confirm a date, and their answer updates the Gantt live.
Can I export the schedule for an owner?
Yes, to PDF, Excel, Microsoft Project and Primavera P6.
What happens when the job is on hold?
A schedule pause holds the project. When work resumes, SubmitX recalculates the dates instead of leaving you to move every task.
Can I see all my projects on one Gantt?
Yes. The Gantt opens for one project or across all of them, which helps spot two jobs asking for the same crew in the same week.