Which software sends price requests to subcontractors and compares their prices?
To send price requests to subcontractors and compare them on a bid, you need a tool that sends the same scope to every subcontractor in a trade, collects their answers in one place and shows them side by side. Construction management software with bid invitations and a subcontractor portal does that; with email and a spreadsheet it works too, but you retype every price.
Whatever the tool, the method is what protects your margin: a clear scope, identical quantities for everyone, a deadline and a leveling sheet. Software speeds up the method, it does not replace it.
How to organize subcontractor prices when preparing a construction bid
Split the project by trade (packages)
Electrical, plumbing, drywall, roofing, excavation and so on. One package per trade, with what is included and what is not. Grey areas (who supplies sleeves, who does firestopping?) get settled here, not after prices come in.
Write a clear scope
List of work, drawings and sheets covered (with their revision), specifications, site requirements (hours, access, bins, cleanup). Whatever you leave out, each bidder reads their own way.
Give everyone the same quantities
If you have a takeoff, send it. Identical quantities make prices comparable and expose the offer that missed part of the work.
Set a realistic deadline
Early enough to level before your own bid is due. Follow up two or three days before: silence is not a no until the date has passed.
Level the answers
One column per subcontractor, the same rows for everyone (see the template below). Adjust each price for what it excludes, so you compare equal scope.
Choose, not just the lowest
Leveled price, timing, real capacity on your schedule, licence (RBQ in Quebec), insurance, compliance documents, track record with you.
Carry the chosen price into the bid
The subcontractor's price goes in as cost, then your markup is added. Keep a record of who was chosen and on which offer.
Bid leveling sheet template
A leveling sheet puts every offer in a package on the same basis. The submitted price is only the starting point: you add the estimated value of what the subcontractor excludes and someone will still have to pay for.
| Criterion | Subcontractor A | Subcontractor B | Subcontractor C |
|---|---|---|---|
| Submitted price | Offer amount | Offer amount | Offer amount |
| Inclusions match the scope | Yes | Partial (missing firestopping) | Yes |
| Exclusions to add | None | Estimated firestopping | Estimated daily cleanup |
| Leveled price | Submitted price | Submitted price + exclusions | Submitted price + exclusions |
| Timing and availability | Meets schedule | Meets schedule | Starts two weeks later |
| Valid licence (RBQ) | Checked | Checked | To check |
| Liability insurance | Received | Received | Not received |
| Revenu Québec and CNESST documents | Received | Received | Not received |
| Offer validity | 30 days | 60 days | Not stated |
💡 An offer far below the others deserves a phone call before you accept it: often part of the work was misunderstood. Better to find out before you sign your own contract.
For the documents to request from a Quebec subcontractor (Revenu Québec certificate, CNESST, insurance), see our guide to subcontractor documents.
Choosing the right subcontractor and carrying the price with markup
The lowest leveled price is a good starting point, not a decision. A subcontractor who cannot start on time delays every trade that follows. Another without valid insurance exposes you. Write down the reason for your choice in the sheet: it helps if the client or a partner asks.
- Carry the leveled price, not the submitted one, if you take on an exclusion yourself.
- Add your markup on the subcontractor's cost, as on your other line items.
- Keep the chosen offer with the bid: it defines what the subcontractor committed to.
- Let the other bidders know: it is the best way to get answers next time.
Where can I find a reliable subcontractor for my business?
Your own history is still the best source: after each project, note who kept to price, schedule and quality. Add referrals from other contractors, trade suppliers and trade associations, then check the licence (in Quebec, on the RBQ register). Our article on finding a construction subcontractor in Quebec covers these sources.
Email and spreadsheets or software: what changes
| Task | Email and spreadsheet | Software with bid invitations |
|---|---|---|
| Sending the scope | One email per subcontractor, attachments to keep current | One send per package, same documents for all |
| Answers | In each inbox, in different formats | In a portal, in one place |
| Comparison | Prices retyped into a sheet | Offers side by side |
| Compliance | Documents chased one by one | Document tracking per subcontractor |
| Carrying into the bid | Copy and paste | Chosen price tied to the project |
For two or three packages per bid, a good email template and the sheet above are enough. Software pays off when you prepare several bids a month with five or more packages each.
What a price request should include
- Project name and address, the client (if it can be named) and the building type.
- The package and its scope: included, excluded, interfaces with other trades.
- Drawings and specifications with their revision number, and the takeoff if you have one.
- The response deadline and the planned start date of the work.
- The expected answer format: lump sum, unit prices, written exclusions, validity period.
- Documents requested: licence, insurance and, in Quebec, the Revenu Québec certificate and CNESST.
- Who to contact with questions, and the rule: any answer to a question goes to every bidder in the package.
How SubmitX handles subcontractor price requests
- Bid invitations by email: you pick the subcontractors; they get an email and answer in their subcontractor portal.
- Packages from the drawings: from the takeoff of a PDF plan (TakeOff AI), SubmitX prepares one package per trade with scope and quantities.
- Your prices stay private: your selling prices are never sent to subcontractors.
- Compliance: tracking of documents (Revenu Québec certificate, CNESST, insurance) and holdbacks.
- Bid: the chosen price goes into your bid, where every price keeps its source.
Limits: SubmitX is young software, publicly launched in June 2026, and an AI takeoff should always be checked before sending. Ask to see a bid invitation built from one of your drawings in a demo. See also our article on subcontractor management.
When to choose something other than SubmitX
- You have worked with the same three or four subcontractors for years and they give you prices by phone: a paper sheet is enough.
- You are a large general contractor whose subcontractors already work in Procore: staying on the platform they know has value (pricing on quote).
- Your current ERP (Maestro, for example) already handles price requests and costs: improve the method rather than the tool.
- Your company runs on monday.com: a system built on it, such as Direction by Horizon, lists price request and subcontractor compliance modules.
To compare options, see our comparisons page.
Frequently asked questions
Which software sends price requests to subcontractors and compares their prices?
Construction management software with bid invitations and a subcontractor portal: it sends the same scope to every subcontractor in a package, collects answers in one place and shows them side by side. For low volume, email and a spreadsheet are enough.
How do I organize subcontractor prices when preparing a construction bid?
Split by trade, send the same scope and quantities to everyone with a deadline, level the answers in a sheet, choose on leveled price and reliability, then carry the chosen price into the bid with your markup.
What is a bid leveling sheet?
A table that puts all offers in one package on the same basis: submitted price, inclusions, added exclusions, timing, licence, insurance. The leveled price is the one you compare.
How many prices should I get per trade?
Three is common practice: enough to compare without wearing out subcontractors. For a large package or a rare trade, ask more; for a long-time partner, two may be enough.
Should I always pick the cheapest subcontractor?
No. Compare the leveled price, then availability, licence, insurance, compliance documents and your past experience. An offer far below the others often hides a scope gap.
Where can I find a reliable subcontractor for my business?
In your own project history, through referrals from other contractors, suppliers and trade associations. Always check the licence (in Quebec, on the RBQ register) and ask for compliance documents.