Renovation quotes: how to describe your project so you can compare

Three contractors, three very different prices: often, they did not price the same project. Here is how to describe yours, with a project sheet to copy, so the quotes you get can actually be compared.

Why a precise description changes everything

Quebec's consumer protection office, the Office de la protection du consommateur (OPC), advises defining your project clearly, ideally in writing, then giving that plan to three different contractors to get a quote from each. The plan also helps you stay on budget, the OPC notes. Without a shared description, each contractor imagines their own version: a bit more finishing here, a cheaper material there, cleanup included by one and not by another.

According to the OPC, a quote is a written estimate of costs and materials. It usually takes the form of a fixed price for the whole project or an hourly rate for a planned number of hours. A clear description lets the contractor price accurately, and lets you know which kind of price you are being given.

The eight elements of a good description

1

Scope: what is included

Describe each room or area and each job you expect: demolish, redo, replace, add. Also write down what is not included, such as painting or appliances, to avoid misunderstandings.

2

Plans or, failing that, photos

Attach any existing plans you have. Otherwise, photograph each room from several angles, with a familiar object in the frame to give a sense of scale.

3

Measurements

Measure lengths, widths and heights with a tape measure. Note that they are approximate and ask the contractor to confirm them during the visit.

4

The materials you want

Name the materials, brands or quality levels that matter to you (type of flooring, countertop, siding). If you are open to suggestions, say so.

5

Schedule

Give a preferred start date and, if there is one, a deadline (a gathering, a move). Ask that each quote state the start and end dates, as the OPC recommends.

6

Approximate budget

A range lets the contractor propose what fits your budget and what would be optional. You do not have to reveal an exact figure.

7

Access constraints

Upper floor, narrow staircase, parking, access to water and electricity, condo rules, neighbours, whether you will be home: anything that complicates the work belongs on the sheet.

8

Permits

Ask your municipality whether a permit is needed. Then state on the sheet and in the contract who handles it, you or the contractor: the RBQ (Régie du bâtiment du Québec) recommends knowing this before you sign.

A project sheet template to copy

Copy this template into an email or a document, fill it in once, then send exactly the same sheet to each contractor.

SectionWhat to write
Project in one sentenceE.g.: redo the second-floor bathroom
Address and type of buildingCity, house, semi-detached or condo, approximate age
Work includedRoom-by-room list
Work excludedWhat you will do yourself or later
Plans, photos, measurementsAttachments, approximate measurements to be confirmed
Materials wantedTypes, brands or quality level
SchedulePreferred start, any deadline
Approximate budgetA range, with what could be optional
Access and constraintsFloors, parking, water, electricity, condo rules
PermitsChecked with the municipality: yes or no, and who handles it
What the quote should containItemized price, dates, payment terms, RBQ licence number, proof of insurance

End with one simple sentence: "Please include your RBQ licence number, your subclasses and proof of your civil liability insurance." It will save you from chasing that information.

Photos, measurements and the visit: avoiding misunderstandings

A photo has no scale and a plan is not always up to date. The contractor's visit remains the surest way to confirm the scope. After the visit, ask them to carry your sheet into their quote, item by item, and to flag any difference: work added, material substituted, item excluded. That way, every quote answers the same question.

Let's talk

Planning a construction or renovation project?

Leave your details: a team member will explain how SubmitX Network works and let you know when your region opens. No commitment.

  • Waitlist
  • Free sign-up
  • RBQ licence checked
  • Law 25

Rather try it yourself? Free 7-day trial, no credit card →

Budget and schedule: how much to share?

Giving a budget range does not commit you to spending all of it. It helps the contractor propose suitable options. If you would rather not share it, ask for a base price for the project as described, with options priced separately.

On scheduling, contractors have their own calendars: ask for the possible start date and the expected duration, then have both written into the contract. The English version of the OPC's page suggests a deadline clause stating that the work will be finished by a specific date, failing which the contractor refunds the deposit. Confirm this with the contractor when drafting the contract.

💡 Same sheet, same questions, same attachments for everyone: that is what makes three quotes comparable.

After sending: what each quote should contain

According to the OPC, a quote should include the following. If anything is missing, ask for it in writing:

Once all three quotes are in, move on to the next step with comparing renovation quotes. For the checks to do on the contractor themselves, see Finding a renovation contractor in Quebec.

Where SubmitX Network fits in

The SubmitX Network "individual" profile follows the same logic. It asks for the type of project (interior or exterior renovation, addition, new construction, emergency repair, landscaping or other project) and when you would like to start, from as soon as possible to "just looking for information". An individual searches: they are not listed in the directory.

The network is closed for now, with a region-by-region waitlist. You can prepare your profile and sign up for free; a single email will let you know when your region opens. No SubmitX software account is required. To understand how the network works, read What is SubmitX Network?.

Frequently asked questions

Should I tell contractors my budget?

Nothing requires you to. A range does help the contractor suggest suitable solutions and separate what is essential from what is optional. If you would rather keep it to yourself, ask for a base price for the project as described, then for options priced separately. Either way, insist on an itemized breakdown in the quote.

Can I send the same project sheet to several contractors?

Yes, that is the whole point. The OPC advises giving your plan to three different contractors and asking each one for a quote. Sending the same sheet, with the same photos and measurements, ensures all three are answering the same question. Note the date you sent it so you can politely follow up with anyone slow to reply.

What if a contractor suggests changing my project?

It happens often and is sometimes useful. Ask them to price your project as described first, then their suggestion as a separate option. That way, the three quotes stay comparable and you decide with full knowledge. The OPC also advises having the contract state that the contractor must get your authorization before any unplanned work.

Who takes care of the renovation permit?

That is something to agree on and put in writing. The RBQ advises knowing, before you sign, whether you or the contractor will obtain the building or renovation permit. Éducaloi recommends checking with your municipality which permits are required, since not having one can lead to a fine. Confirm with your municipality.

Official sources

Consulted on October 21, 2026. Rules can change: confirm with the relevant body before acting.

Manage quotes, projects, CCQ payroll and invoicing in one piece of software

SubmitX brings it all together in one place: AI prepares, you approve. Permanent Free plan, 7-day trial of paid plans with no credit card.

7-day trial · no credit card · or call 514-835-8734