The specific challenges of the trade in Quebec
Drywall economics are all about the square foot:
- Sheet counts — 4×8 vs 4×12, ceilings, closets: manual counts drift
- Taping levels — level 3, 4 and 5 each have different labour math
- Two crews, one schedule — hangers then tapers, three coats plus sanding
- Progress billing — getting paid per completed phase, holdbacks handled
- CCQ plasterer rates — classifications applied to payroll correctly
GCs squeeze drywall prices hard; the winners know their real cost per sq ft at each finish level — and bid exactly there.
What a professional bid must contain
Based on industry best practices and what Quebec clients and general contractors expect:
| Element | Residential | Commercial / Institutional |
|---|---|---|
| Sq ft by room and ceiling | Mandatory | Mandatory |
| Finish level (3/4/5) | Mandatory | Mandatory |
| Sheets and materials | Recommended | Mandatory |
| RBQ licence number | Mandatory | Mandatory |
| Phase schedule | Recommended | Mandatory |
| CCQ labour | If applicable | Mandatory |
How SubmitX works for your trade
AI board takeoff
Sheets (4×8/4×12), screws and compound computed per room and ceiling from plans.
Your rates per level
Hanging + finishing rates per sq ft at levels 3, 4 and 5 applied automatically.
Crews sequenced
Hanging, coats 1-2-3 and sanding scheduled across hanger and taper crews.
Progress billing
Bill per completed phase; RBQ holdbacks and extras signed along the way.
💡 Real case: drywall contractors report estimate accuracy within 2% when takeoffs come from plans — the difference between winning thin and losing quietly.
SubmitX vs Excel vs generic software
| Criterion | Excel / paper | Generic software | SubmitX ERP |
|---|---|---|---|
| Sheet takeoff | Manual count | Spreadsheet | AI from plans |
| Rates by finish level | Averaged | Single rate | Per level 3/4/5 |
| Crew sequencing | Phone calls | Basic | Hang + 3 coats scheduled |
| Progress billing | Manual | Generic | Per phase + holdbacks |
| Zone progress photos | No | No | Per room |
| CCQ payroll | No | No | Automatic |
Pricing and return on investment
SubmitX starts at $99/month CAD. On commercial drywall volumes, pricing from your real per-level costs instead of an averaged rate is worth points of margin on every contract.
Phase billing accelerates cash: invoicing at each completed coat instead of at the end changes the season's cash flow entirely.
Frequently asked questions
What is the best drywall estimating software in Quebec?
SubmitX computes sheets, screws and compound from plans, applies your per-sq-ft rates by taping level (3/4/5), sequences hanger and taper crews and bills per phase. From $99/month, free trial.
Does it handle level 5 finishes?
Yes — each finish level carries its own labour rates, so level 5 work is priced at level 5 costs, not an average.
Does it pay plasterers at CCQ rates?
Yes — CCQ classifications and 2026 rates are applied to payroll automatically.