Concrete contractor software from takeoff to pour day
Take off volumes from the plan, bill per cubic yard, put pours on the schedule and see what each crew really produces per unit.
What concrete crews deal with
Volumes worked out on a napkin
Slab, footings and walls calculated by hand, and a short order on pour day costs a truck.
Pours that move with the weather
The schedule changes daily and the trades after you find out last.
No real production numbers
You bid formwork by the foot without knowing what your crew actually does per day.
What concrete contractors use most
Volume takeoff
PDF plan takeoff for slabs, footings and walls, plus free site calculators.
Learn more →Billing per cubic yard
Measured billing per cubic yard or cubic metre, with sections and an internal waste factor.
Learn more →Pours on the Gantt
Pour dates on the schedule, with confirmations sent to the trades involved by link.
Learn more →Crew production per unit
End-of-shift quantities give time and labor cost per unit for each crew.
Learn more →Equipment and rentals
Equipment fleet and rentals with costs, delivery and pickup fees, linked expenses and utilization.
Learn more →
Know your real cost per yard
At the end of each shift, the foreman enters quantities produced. SubmitX turns them into time and labor cost per unit, by crew.
Next time you bid, you price from what your crew actually does, not from a number you heard ten years ago.
A typical slab job
Takeoff
Measure the slab on the plan, get volume in cubic yards.
Bid
Price per cubic yard plus forming and finishing, signed online by the client or GC.
Pour
Pour date on the Gantt, crew clocked in, photos and quantities logged.
Bill
Progress invoice with holdback (retainage) or an AIA payment application.
For concrete and formwork crews




Concrete contractor questions
Can I bill per cubic yard?
Yes. Measured billing works per cubic yard or cubic metre, with sections and an internal waste factor never shown to the client.
Can I track production per crew?
Yes. End-of-shift quantities give time and labor cost per unit for each crew, on each project.
Can I bill a GC with AIA G702/G703?
Yes. AIA G702/G703 payment applications and progress invoices with holdback (retainage) are available.
Does it track rented equipment?
Yes. The equipment fleet covers rentals with costs, delivery and pickup fees, linked expenses and utilization.
