Software for concrete contractors

Concrete contractor software from takeoff to pour day

Take off volumes from the plan, bill per cubic yard, put pours on the schedule and see what each crew really produces per unit.

What concrete crews deal with

Volumes worked out on a napkin

Slab, footings and walls calculated by hand, and a short order on pour day costs a truck.

Pours that move with the weather

The schedule changes daily and the trades after you find out last.

No real production numbers

You bid formwork by the foot without knowing what your crew actually does per day.

What concrete contractors use most

Volume takeoff

PDF plan takeoff for slabs, footings and walls, plus free site calculators.

Learn more →

Billing per cubic yard

Measured billing per cubic yard or cubic metre, with sections and an internal waste factor.

Learn more →

Pours on the Gantt

Pour dates on the schedule, with confirmations sent to the trades involved by link.

Learn more →

Crew production per unit

End-of-shift quantities give time and labor cost per unit for each crew.

Learn more →

Equipment and rentals

Equipment fleet and rentals with costs, delivery and pickup fees, linked expenses and utilization.

Learn more →

Site weather

Forecast at the project address with a daily risk for the planned work.

Learn more →
Worker guiding a concrete hose

Know your real cost per yard

At the end of each shift, the foreman enters quantities produced. SubmitX turns them into time and labor cost per unit, by crew.

Next time you bid, you price from what your crew actually does, not from a number you heard ten years ago.

A typical slab job

Takeoff

Measure the slab on the plan, get volume in cubic yards.

Bid

Price per cubic yard plus forming and finishing, signed online by the client or GC.

Pour

Pour date on the Gantt, crew clocked in, photos and quantities logged.

Bill

Progress invoice with holdback (retainage) or an AIA payment application.

For concrete and formwork crews

Concrete contractor questions

Can I bill per cubic yard?

Yes. Measured billing works per cubic yard or cubic metre, with sections and an internal waste factor never shown to the client.

Can I track production per crew?

Yes. End-of-shift quantities give time and labor cost per unit for each crew, on each project.

Can I bill a GC with AIA G702/G703?

Yes. AIA G702/G703 payment applications and progress invoices with holdback (retainage) are available.

Does it track rented equipment?

Yes. The equipment fleet covers rentals with costs, delivery and pickup fees, linked expenses and utilization.

Bring your next slab

We will take it off and build the bid with you during the demo.